Telehouse West

Vibration

Telehouse West

Project:2010
Location:London
Country:United Kingdom
Sector:Vibration Assessment & Displacement Analysis

The objective of this project was to factually present the results of a vibration survey at Telehouse West to establish the relative displacement between groups of sensors during a shock loading test.

 

Inside the building adjacent to the large cargo lift are rooms on two levels with control cabinets which control the supply of backup power in the event of power failure. This includes supply of power through some busbars. The cabinets stand on a raised access floor itself mounted from a concrete slab. The busbars hang from a structural steel section mounted at high level.

 

The maximum relative displacement between the cabinet and the busbar occurred on the first floor, with approximately 0.03 mm, 1/200th of the 6.00 mm allowable limit. The cabinets and the basbar moved almost in syncronisation on the second floor, thus the relative movement between the two components was less than 0.01 mm.

Related Projects

Processed Data - Displacement Results
Telehouse West construction site
Large Cargo Lift
Backup Power Supply Cabinets
Data Acquisition System

Subscribe & get 20% off on your first project, Be with us

    Cart (0 items)

    Center for Applied Engineering Science

    Contact Info

    Mon - Frd : 8:00 -16:00
    +44 (0) 20 8647 1908
    +44 (0) 20 8405 2076
    ced@environmental.co.uk

    Office Address

    Civil Engineering Dynamics Ltd 8-11 Oak Walk, BedZED Centre Hackbridge, Surrey SM6 7DE